PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct Work delivery for the 1st Floor Facing East(800x600).jpg Installed electrical wire at the 3rd Floor Facing East (800x600).jpg Installed steel plates at the perimeter of the roof to support the metal decking (800x600).jpg Installing duct work at the 1st Floor Facing North (800x600).jpg Installing Top track at the 3rd Floor Facing East (800x600).jpg Metal Clips around the perimeter of the roof (South Elevation) (800x600).jpg Metal clips aroung the perimeter of the 3rd Floor Facing West (800x600).jpg Patching of Stair -2 (800x600).jpg Patching Stair -2 (800x600).jpg
Previous pageNext page Installing Top track at the 3rd Floor Facing East (800x600)
Installing Top track at the 3rd Floor Facing East (800x600)